20,000 KM PREVENTIVE MAINTENANCE FOR TOYOTA INNOVA

The following are the jobs done for our Toyota Innova Diesel Engine for the 20,000 KM Preventive Maintenance Schedule on December 2019. As per the service billing the jobs done are the following:

1.      Replaced Engine Oil
2.      Replace Engine Oil Filter / Gasket
3.      Inspected Air Cleaner Filter
4.   Replace Airconditioner Filter (CAF)
5.     Inspected Brake Pads & Discs
6.   Inspected Ball Joints & Dust Covers
7.   Tightened Bolts & Nuts on Chassis and Body
8.   Inspected Tires & Inflaction Pressure
9.   Inspected Lights, Horn, Wipers & Washer
10. Inspected Battery
11. Inspected Brake Pedal & Parking Brake
12. Inspected Brake Fluid
13. Inspected Clutch Fluid
14. Inspected Power Steering Fluid
15. Lubricated Propeller Shaft with Grease    
16. Tightened Propeller Shaft Bolts
17.  Inspected Water Sediment Accumulator
18. Inspected Steering Wheel, Linkage & Gear Box
19. Inspected Front & Rear Suspension
20. Inspected Exhaust Pipes & Mountings
21. Inspected Brake Linings and Drums (Include Parking Brake Linings and Drums)
22. Inspected Rear Differential Oil
23. Inspected Refrigerant amount for Airconditioner
24. Inspected Vacuum Pump Oil Hose
25. Inspected Brake Line Pipes & Hose
26. Inspected Wheel Alignment (4-Wheel & 2-Wheel)


Total cost for the jobs done is P 5,811.19 including the VAT. Below are the breakdown of prices.

DESCRIPTION
QTY
UNIT PRICE
TOTAL
20,000 KM CHECK-UP
5.300
450.00
2,385
TDO CH-4 15w-40 1L
8.000
206.74
1653.92
Oil Filter
1.000
472.98
472.98
Gasket
1.000
34.04
34.04
Brake Cleaner (Can)
1.000
169.76
169.76
Battery Check
1.000
80
80
TNI-MISC( SAME 10K)
1.000
392.86
392.86
TOTAL (excluding VAT)
5,188.56
VAT
622.63

Monday, November 18, 2019

15,000 KM PREVENTIVE MAINTENANCE FOR TOYOTA INNOVA

The following are the jobs done for our Toyota Innova Diesel Engine for the 15,000 KM Preventive Maintenance Schedule on October 2019 as per recommended by the CASA.

1.      Replaced Engine Oil
2.      Replace Engine Oil Filter / Gasket
3.      Inspected Air Cleaner Filter
4.      Inspected Brake Pads & Discs
5.      Lubricated Propeller Shaft with Grease    
6.      Tightened Propeller Shaft Bolts
7.      Inspected Steering Wheel, Linkage & Gearbox


Total cost for the jobs done is P 5,184.04 including the VAT. Below are the breakdown of prices.

DESCRIPTION
QTY
UNIT PRICE
TOTAL
15,000 KM CHECK-UP
2.2
450.00
990
TDO CH-4 15w-40 1L
8.000
204.69
1,637.52
Oil Filter
1.000
468.30
468.30
Gasket
1.000
33.70
33.70
Brake Cleaner (Can)
1.000
370.54
370.54
BG Brake Stop Squeal
1.000
560
560.00
Rags & Sand Paper
1.000
30
30.00
TOTAL
4090.06
C/A Brakes & Tighten Body Bolts
1.67
500
835.00
Brake Stop Squel Application
0.2
500
100.00
Labor


935



Wednesday, October 9, 2019

10kM, 30kM, 50kM, 70kM Kilometers PMS

As per the Toyota Owner's Manual, below are the things needed for the Preventive Maintenance Schedule for the Innova Diesel Engine 10,000 kM, 50,000 kM and 70,000 kM.


Inspect
Battery
Water Sediment
Brake pedal and parking brake
Brake pads and discs
Brake fluid
Clutch fluid
Power Steering
Suspension ball joints and dust cover
Tire and inflation pressure
Lights, horn, wipers and washer

Replace
Engine Oil
Engine Oil Filter

Lubricate
Propeller shaft grease

Tighten
Propeller shaft bolts

Tire Rotation

Friday, October 4, 2019

1,000 KM PREVENTIVE MAINTENANCE SCHEDULE FOR TOYOTA INNOVA


The following are the jobs done for our Innova-Diesel Engine Automatic Transmission for the 1,000 KM Preventive Maintenance Schedule on December 2018 as per recommended by the CASA.

1.      Replaced Engine Oil
2.      Replace Engine Oil Filter
3.      Inspected Air Cleaner Filter
4.      Inspected Brake Pads & Discs
5.      Lubricated Propeller Shaft with Grease
6.      Tightened Propeller Shaft Bolts
7.      Inspected Steering Wheel, Linkage & Gearbox

Total cost for the jobs done is P 1,997.54 without VAT. Below are the breakdown of prices.
DESCRIPTION
QTY
UNIT PRICE
TOTAL
5,000 KM CHECK-UP
2.200
450.00
1710.00
TDO CH-4 15w-40 1L
8.000
193.08
1,600.00
Oil Filter
1.000
421.20
444.91
Gasket
1.000
31.70
33.70
TOTAL
1,997.54

5,000 KM PREVENTIVE MAINTENANCE SCHEDULE FOR TOYOTA INNOVA


The following are the jobs done for our Innova-Diesel Engine Automatic Transmission for the 5,000 KM Preventive Maintenance Schedule on March 2019 as per recommended by the CASA.

1.      Replaced Engine Oil
2.      Replace Engine Oil Filter
3.      Inspected Air Cleaner Filter
4.      Inspected Brake Pads & Discs
5.      Lubricated Propeller Shaft with Grease
6.      Tightened Propeller Shaft Bolts
7.      Inspected Steering Wheel, Linkage & Gearbox

Total cost for the jobs done is P 2,069.20 without VAT. Below are the breakdown of prices.
DESCRIPTION
QTY
UNIT PRICE
TOTAL
5,000 KM CHECK-UP
2.200
450.00
1710.00
TDO CH-4 15w-40 1L
8.000
200.00
1,600.00
Oil Filter
1.000
436.16
444.91
Gasket
1.000
33.04
33.70
Washing (Can)
1.000
75.89
0.00
TOTAL
2,069.20

10,000 KM PREVENTIVE MAINTENANCE SCHEDULE FOR TOYOTA INNOVA


The following are the jobs done for our Toyota Innova Diesel Engine for the 10,000 KM Preventive Maintenance Schedule on June 2019 as per recommended by the CASA.

1.      Replaced Engine Oil
2.      Replace Engine Oil Filter
3.      Inspected Air Cleaner Filter
4.      Inspected Brake Pads & Discs
5.      Inspected Ball Joints & Dust Covers
6.      Tightened Bolts & Nuts on Chassis & Body
7.      Inspected Tires & Inflation Pressure
8.      Inspected Lights, Horn, Wipers & Washers
9.      Inspected Battery
10.   Inspected Brake Pedal & Parking Brake
11.   Inspected Brake Fluid
12.   Inspected Clutch Fluid
13.   Inspected Power Steering Fluid
14.   Lubricated Propeller Shaft with Grease
15.   Tightened Propeller Shaft Bolts
16.   Inspected Water Sediment Accumulator
17.   Inspected Steering Wheel, Linkage & Gearbox
18.   Inspected Brake Linings and Drums (Include Parking Brake Linings and Drums)
19.   Inspected Brake Line Pipes & Hoses
20.   Inspected Wheel Alignment (4-Wheel & 2-Wheel)

Total cost for the jobs done is P 4,221.31 not including the VAT. Below are the breakdown of prices.
DESCRIPTION
QTY
UNIT PRICE
TOTAL
10,000 KM CHECK-UP
3.800
450.00
1,710.00
TDO CH-4 15w-40 1L
8.000
204.02
1,632.16
Oil Filter
1.000
444.91
444.91
Gasket
1.000
33.70
33.70
Brake Cleaner (Can)
1.000
370.54
370.54
TOTAL
4221.31

Friday, December 1, 2017

PICE 43rd National Convention

43rd PICE National Convention held at SM MOA Arena on Nov. 28-30, 2017.
The 43rd PICE National Convention Themed Build! Build! Build! For Smart, Strong and Sustainable Society, was held at SM MOA Arena from Nov 28, 2017 to Nov. 30, 2017 with almost 13,000 Civil Engineers present. As of this date, this is one of the most attended national civil engineer convention in history because of the required credit point units required to renew the PRC license.
When we have entered the arena, tight security has been placed and tickets need to be scanned which was distributed in our respective emails and we need to print. No ticket, No entry. They also provided us a paper band wrist so that we go re-enter the arena. Guide Personnel where present in every floor. And seat where distributed randomly. When we have entered the arena, we could see that each seat has a bag containing convention materials (convention magazine, notebook, ball pens, ID case which the printed ID cannot fit). At first, many seats were vacant. Thus, it became almost full in the late morning.


Government leaders, which were the keynote addresses, attended the convention. DoTR Secretary Arthur P. Tugade who discussed the plan to build, restore and upgrade airports in the Philippines, BCDA President Vivencio B. Dizon who talked about the Smart Green City at Clark and DPWH Secretary Mark Villar who discussed the plans of the Duterte Administration (like the subway station in Metro Manila and Davao, additional bridges in Metro Manila, North rail project, etc.)  and higher budget for infrastructure projects to improve economic growth.  by the BBB Team.  There is also technical speaker which is Engr. Deo Manalo, General Manager of MRT which talked about the Railway Engineering.Maria Catalina E. Cabral, Ph.D., National President of PICE and also Undersecretary of DPWH, announce that PICE is already an ISO 9001:2015 certified and for us to earn credit points, delegates need to have their ID scanned by the checker for each technical speaker, the first time that PICE will use the system.

Some technical speakers where foreigners, mostly Japanese, that discussed tunnel
engineering, bridge engineering and rail engineering.  While Pilipino speakers discussed about Construction arbitration, Environmental engineering, Geotechnical engineering,
transportation engineering, water engineering, structural engineering and project management engineering. Most of the talk where very interesting topic but probably a lot of us don't understand the technical session because
we could not see clearly the presentation.


Overall, the national convention was a success, although I am a bit disappointed with the credit units I earned for the convention which is 9.0 units, and I think this is the maximum credit units for a participant which had attended the 43rd national convention.

Hopefully, the PICE committee would understand that it is very hard to attend a seminar or convention because of the time and cost. Many of my fellow civil engineers who attended the convention has come from far places like Mindanao just to earn credit units. I suggest that PICE committee should set a technical session of at least 15 credit units for the next PICE convention, for the participants who will attended full the technical session, to lessen the burden of the participants.

I also hope that for the next convention, PICE will prove to us participants, that convention are worth our time and money.

Checker using cellphone to get attendance.
Checker's using cellphone to get attendance.
Convention Materials